Quick update
The roof is 95 percent complete. Just the edge details left to sort out. The large window at the rear is being installed as I write. Wiring has started. Everybody except the metalwork contractor is pulling their weight. We still have no date for the steel stair and front railings. It's looking very likely that the house will be finished without a stair. This is not good news as The Client is not very happy when climbing ladders. Still, I'm sure that with a bit of practice she'll be up and down the ladder like a ships boy in the rigging.
Le projet, dan sa volumétrie, est une réponse simple et économique à l’évolution des réglementations multiples et contraignantes d’urbanisme dans une zone inondable.
L’hétérogénéité architecturale du quartier pavillonnaire permet une esthétique unique exprimée par le choix des matériaux pour les façades et la composition informelle des baies.
La maison consiste en un volume rectangulaire implanté entre les deux limites séparatives. Le volume est
divisé en trois éléments principaux: